„weighted completion time“
Suchergebnisse
1.000+ Treffer
-
Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time
-
Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups
-
Minimizing total weighted completion and batch delivery times with machine deterioration and learning effect: a case study from wax production
-
Single machine lot scheduling to minimize maximum weighted completion time
-
An Efficient Polynomial Time Approximation Scheme for Minimizing the Total Weighted Completion Time on Uniformly Related Machines
-
Flow shops with reentry: The total weighted completion time objective
-
An EPTAS for Minimizing the Total Weighted Completion Time of Jobs with Release Dates on Uniformly Related Machines
-
Approximation Schemes for Minimizing Average Weighted Completion Time with Release Dates
-
Infinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods
-
Single Machine Scheduling with Few Deadlines
-
Approximation Algorithms for Scheduling with Resource and Precedence Constraints
-
An FPTAS of Minimizing Total Weighted Completion Time on Single Machine with Position Constraint
-
Rescheduling due to machine disruption to minimize the total weighted completion time
-
A note on minimizing total weighted completion time with an unexpected machine unavailable interval
-
Machine Scheduling to Minimize Weighted Completion Times – The Use of the α-point
-
Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time
-
The Expected Competitive Ratio for Weighted Completion Time Scheduling
-
The constrained minimum weighted sum of job completion times problem
-
Minimizing total weighted completion time approximately for the parallel machine problem with a single server
-
On scheduling with non-increasing time slot cost to minimize total weighted completion time